[See Steps] A study of times for a carpentry job is shown in the following table: observations minutes per cycle Element FN % 1 2 3 4 5 6 1 110 1.20 1.17
Question: A study of times for a carpentry job is shown in the following table:
observations minutes per cycle
| Element | FN % | 1 | 2 | 3 | 4 | 5 | 6 |
| 1 | 110 | 1.20 | 1.17 | 1.16 | 1.22 | 1.24 | 1.15 |
| 2 | 115 | 0.83 | 0.87 | 0.78 | 0.82 | 0.85 | 1.32* |
| 3 | 105 | 0.58 | 0.53 | 0.52 | 0.89 | 0.60 | 0.54 |
* unusual delay, do not take into account
- assuming that the company grants a personal time of 20 minutes and a delay time of 30 minutes, per shift of 8 working hours.. calculate the standard time for this work
- determine the production per hour after getting the standard time
- determine the number of observations necessary for the analyst to have 95% confidence that the resulting standard time is within 2% of the actual value