(See) A study of times for a work that contains 4 elements, showed the following observed times and the leveling factor for the 6 cycles shown observations


Question: A study of times for a work that contains 4 elements, showed the following observed times and the leveling factor for the 6 cycles shown

observations minutes per cycle

Element qualification 1 2 3 4 5 6

  1. Determine the average cycle time for each element. .
  2. Find the level time for each element
  3. Assuming a tolerance factor of 15%, calculate the standard time for this job.
  4. Determine the production per hour with this standard time