A machine set to fill a bottle with 60.0 grams of liquid was started at 7:00 a.m. today. Slight vari


Question: A machine set to fill a bottle with 60.0 grams of liquid was started at 7:00 a.m. today. Slight variations (called chance variation or sampling fluctuation) were expected. The quality control inspector made her initial check of the weights at 8:00 a.m. She selected a five bottles from the first hour of production and weighed the contents of each bottle. The results of the first seven inspections follow;

Time 1 2 3 4 5
8 a.m. 60.0 59.9 60.0 60.0 60.1
9 a.m. 60.0 60.2 60.1 60.2 60.0
10 a.m. 60.1 60.1 60.0 59.8 60.0
11 a.m. 60.0 59.8 60.0 60.0 60.2
12 noon 60.2 60.0 59.8 60.1 59.8
1 p.m. 60.3 60.1 59.9 60.1 59.8
2 p.m. 60.1 59.8 59.7 59.9 59.8

a) Compute the lower and upper control limits for the sample means

b) Construct a control chart for the sample means.

c) Is the process in control? Explain!

Price: $2.99
Solution: The solution consists of 2 pages
Deliverable: Word Document

log in to your account

Don't have a membership account?
REGISTER

reset password

Back to
log in

sign up

Back to
log in