Mexicana Wire Works Ron Garcia felt good about his first week as a management trainee at Mexicana Wire
Mexicana Wire Works
Ron Garcia felt good about his first week as a management trainee at Mexicana Wire Winding, Inc. He had not yet developed any technical knowledge about the manufacturing process, but he had toured the entire facility, located in the suburbs of Mexico City, and had met many people in various areas of the operation. Mexicana, a subsidiary of Westover Wire Works, a Texas firm, is a medium-sized producer of wire windings used in making electrical transformers. Carlos Alverez, the production control manager, described the windings to Garcia as being of standardized design. Garcia’s tour of the plant, laid out by process type (see Figure 7.20), followed the manufacturing sequence for the windings: drawing, extrusion, winding, inspection, and packaging. After inspection, good product is packaged and sent to finished product storage; defective product is stored separately until it can be reworked. On March 8, Vivian Espania, Mexicana’s general manager, stopped by Garcia’s office and asked him to attend a staff meeting at 1:00 P.M. "Let’s get started with the business at hand," Vivian said, opening the meeting. "You all have met Ron Garcia, our new management trainee. Ron studied operations management in his MBA program in southern California, so I think he is competent to help us with a problem we have been discussing for a long time without resolution. I’m sure that each of you on my staff will give Ron your full cooperation." Vivian turned to José Arroyo, production control manager. "José, why don’t you describe the problem we are facing?" "Well," José said, "business is very good right now. We are booking more orders than we can fill. We will have some new equipment on line within the next several months, which will take care of our capacity problems, but that won’t help us in April. I have located some retired employees who used to work in the drawing department, and I am planning to bring them in as temporary employees in April to increase capacity there. Because we are planning to refinance some of our long-term debt, Vivian wants our profits to look as good as possible in April. I’m having a hard time figuring out which orders to run and which to back order so that I can make the bottom line look as good as possible. Can you help me with this?" Garcia was surprised and apprehensive to receive such an important, high-profile assignment so early in his career.
Recovering quickly, he said, "Give me your data and let me work with it for a day or two."
Discussion Questions
- What recommendations should Ron Garcia make, with what justification? Provide a detailed analysis with charts, graphs, and computer printouts included.
- Discuss the need for temporary workers in the drawing department.
- Discuss the plant layout.
Old Oregon Wood Store
In 1992, George Brown started the Old Oregon Wood Store to manufacture Old Oregon tables. Each table is carefully constructed by hand using the highest quality oak. Old Oregon tables can support more than 500 pounds, and since the start of the Old Oregon Wood Store, not one table has been returned because of faulty workmanship or structural problems. In addition to being rugged, each table is beautifully finished using a urethane varnish that George developed over 20 years of working with wood-finishing materials.
The manufacturing process consists of four steps: preparation, assembly, finishing, and packaging. Each step is performed by one person. In addition to overseeing the entire operation, George does all of the finishing. Tom Surowski performs the preparation step, which involves cutting and forming the basic components of the tables. Leon Davis is in charge of the assembly, and Cathy Stark performs the packaging.
Although each person is responsible for only one step in the manufacturing process, everyone can perform any one of the steps. It is George's policy that occasionally everyone should complete several tables on his or her own without any help or assistance. A small competition is used to see who can complete an entire table in the least amount of time. George maintains average total and intermediate completion times.
It takes Cathy longer than the other employees to construct an Old Oregon table. In addition to being slower than the other employees, Cathy is also unhappy about her current responsibility of packaging, which leaves her idle most of the day. Her first preference is finishing, and her second preference is preparation.
In addition to quality, George is concerned with cost and efficiency. When one of the employees misses a day, it causes major scheduling problems. In some cases, George assigns another employee overtime to complete the necessary work. At other times, George simply waits until the employee returns to work to complete his or her step in the manufacturing process. Both solutions cause problems. Overtime is expensive, and waiting causes delays and sometimes stops the entire manufacturing process.
To overcome some of these problems, Randy Lane was hired. Randy's major duties are to perform miscellaneous jobs and to help out if one of the employees is absent. George has given Randy training in all phases of the manufacturing process, and he is pleased with the speed at which Randy has been able to learn and help out if one of the employees is absent. George has given Randy training in all phases of the manufacturing process, and he is pleased with the speed at which Randy has been able to learn how to completely assemble Old Oregon tables. Total and intermediate completion times for Randy are given.
Manufacturing Time in Minutes
Manufacturing Time in Munites for Randy Lane
Discussion Questions
- What is the fastest way to manufacture Old Oregon tables using the original crew? How many could be made per day?
- Would production rates and quantities change significantly if George would allow Randy to perform one of the four functions and make one of the original crew a backup person?
- What is the fastest time to manufacture a table with the original crew if Cathy is moved to either preparation or finishing?
The Winter Park Hotel
Donna Shader, manager of the Winter Park Hotel, is considering how to restructure the front desk to reach an optimum level of staff efficiency and guest service. At present, the hotel has five clerks on duty, each with a separate waiting line, during peak check-in time of 3:00 P.M. to 5:00P.M. Observation of arrivals during this period shows that an average of 90 guests arrive each hour (although there is no upward limit on the number that could arrive at any given time). It takes an average of 3 minutes for the front-desk clerk to register each guest. Ms. Shader is considering three plans for improving guest service by reducing the length of time that guests spend waiting in line. The first proposal would designate one employee as a quick-service clerk for guests registering under corporate accounts, a market segment that fills about 30% of all occupied rooms. Because corporate guests are preregistered, their registration takes just 2 minutes. With these guests separated from the rest of the clientele, the average time for registering a typical guest would climb to 3.4 minutes. Under this plan, noncorporate guests would choose any of the remaining four lines. The second plan is to implement a single-line system. All guests could form a single waiting line to be served by whichever of five clerks became available. This option would require sufficient lobby space for what could be a substantial queue. The use of an automatic teller machine (ATM) for check-ins is the basis of the third proposal. This ATM would provide about the same service rate as would a clerk. Because initial use of this technology might be minimal, Shader estimates that 20% of customers, primarily frequent guests, would be willing to use the machines. (This might be a conservative estimate if guests perceive direct benefits from using the ATM, as bank customers do. Citibank reports that some 95% of its Manhattan customers use its ATMs.) Ms. Shader would set up a single queue for customers who prefer human check-in clerks. This line would be served by the five clerks, although Shader is hopeful that the ATM machine will allow a reduction to four.
Discussion Questions
1. Determine the average amount of time that a guest spends checking in. How would this change under each of the stated options?
2. Which option do you recommend?
Deliverable: Word Document