A process produces an average of 100 parts per hour with a variance of 100 parts. The line is design
Question: A process produces an average of 100 parts per hour with a variance of 100 parts. The line is designed to produce 75 to 125 pieces per hour. What percentage of time is this line expected to meet the minimum production rate?
Solution: