A shop has four machinists to be assigned to four machines. The hourly cost of having each machine o
Question: A shop has four machinists to be assigned to four machines. The hourly cost of having each machine operated by each machinist is as follows:
Machine | ||||
Machinist | A | B | C | D |
1 | $10 | $2 | $8 | $6 |
2 | 9 | 5 | 11 | 9 |
3 | 12 | 7 | 14 | 14 |
4 | 3 | 1 | 4 | 2 |
a. Formulate a linear programming model for this problem.
b. Determine the optimal assignment and compute total minimum cost.