[See Solution] Material and labor costs. Many companies must accurately estimate their costs before a job is begun in order to acquire a contract and make
Question: Material and labor costs. Many companies must accurately estimate their costs before a job is begun in order to acquire a contract and make a profit. For example, a heating and plumbing contractor may base cost estimates for new homes on the total area of the house and whether central air conditioning is to be installed.
- Write a main effects model relating the mean cost of material and labor, E(y), to the area and central air-conditioning variables.
- Write a complete second-order model for the mean cost as a function of the same two variables.
- What hypothesis would you test to determine whether the second-order terms are useful for predicting mean cost?
d. Refer to part c. The contractor samples 25 recent jobs and fits both the complete second-order model (part b) and the reduced main effects model (part a), so that a test can be conducted to determine whether the additional complexity of the second-order model is necessary. The resulting SSE and R 2 values are shown in the table. Is there sufficient evidence to conclude that the second-order terms are important for predicting the mean cost? Use \(\alpha \) = .05.
Deliverable: Word Document 