[Step-by-Step] Determine the project’s cost and duration alternatives. Times (durations) in days, costs in $K. Perform three cycles of the process: determine
Question: Determine the project’s cost and duration alternatives. Times (durations) in days, costs in $K. Perform three cycles of the process: determine the crash design, the normal design, and the next two designs (a total of 4 project designs).
Provide your answer in the following format
- Crash design duration and cost: (d, $m)
- Normal design duration and cost: (d, $m)
- Normal design critical path: X-Y-Z
- What activity(ies) will be crashed in this iteration: Y
- First crash duration and cost: (d, $m)
- First crash critical path (s): X-Y-Z; R-C-V
- What activity(ies) will be crashed in this iteration: Y, C
- Second crash duration and cost: (cl, $m)