A manager is trying to determine the amount of time needed to complete a particular assembly. She ta


Question: A manager is trying to determine the amount of time needed to complete a particular assembly. She takes a random sample of 16 assemblies and tracks the time with the following results in hours: Assume the times are normally distributed (2 pts each)

2.7 1.8 1.0 1.2 2.6 1.4 1.3 0.8
2.1 1.6 0.9 1.5 1.8 2.0 1.1 1.3

a. Construct a 95% confidence interval for the amount of time needed for the assembly.

b. What is the point estimate of the mean of the population?

c. What is the margin of error?

d. Interpret the confidence interval

Price: $2.99
See Answer: The downloadable solution consists of 2 pages
Type of Deliverable: Word Document

log in to your account

Don't have a membership account?
REGISTER

reset password

Back to
log in

sign up

Back to
log in