Solution) Dr. Lori Baker, ops mgr at Nesa Electronics, prides herself on excellent assembly-line balancing


Question: 19: Dr. Lori Baker, ops mgr at Nesa Electronics, prides herself on excellent assembly-line balancing. She has been told that the firm needs to complete 96 instruments per 24-hr day. The assembly-line activities are:

a) Draw the precedence diagram.

b) If the daily (24-hr.) production rate is 96 units, what is the highest allowable cycle time?

c) If the cycle time after allowances is given as 10 minutes, what is the daily (24-hr) production rate?

d) With a 10 minute cycle time, what is the theoretical minimum number of stations with which the line can be balanced?

e) With a 10 minute cycle tiMeand six workstations, what is the efficiency?

f) What is the total idle time per cycle with a 10 minute cycle tiMeand six workstations?

g) What is the best work station assignment you can make without exceeding a 10 minute cycle tiMeand what is its efficiency?

Price: $2.99
Solution: The answer consists of 3 pages
Deliverable: Word Document

log in to your account

Don't have a membership account?
REGISTER

reset password

Back to
log in

sign up

Back to
log in