Solution) In setting up a Kanban control system, you need to determine the number of Kanban card sets needed.
Question: In setting up a Kanban control system, you need to determine the number of Kanban card sets needed. The expected demand during lead time is 50 per hour, the safety stock is 20% of the demand during lead time, and the container size is 4. If the lead time to replenish an order is 8 hours, what number of Kanban card sets is needed?
Price: $2.99
Solution: The solution consists of 1 page
Deliverables: Word Document
Deliverables: Word Document
