(See Steps) The following precedence graph describes an item to be assembled on an assembly line. The required daily output is 300 units. The working day
Question: The following precedence graph describes an item to be assembled on an assembly line.
The required daily output is 300 units. The working day is 8.5 hours.
- Determine the required cycle time.
- Determine the theoretical minimum number of workstations.
- Assign tasks to workstations, using "ranked positional weight" as the primary rule and "longest operating time" as the secondary rule. Show your calculations and task assignments on a chart similar to Exhibit TN6.12 on page 239 of the textbook.
- Calculate the efficiency of the solution.