[Solution] Embassy Motorcycles (EM) manufacturers two lightweight motorcycles designed for easy handling and safety. The EZ-Rider model has a new engine
Question: Embassy Motorcycles (EM) manufacturers two lightweight motorcycles designed for easy handling and safety. The EZ-Rider model has a new engine and a low profile that make easy to balance. The Lady-Sport model is slightly larger, uses a more traditional engine, and is specifically designed to appeal to women riders. Embassy produces engines for both models at its Des Moines, Iowa plant. Each EZ-Rider engine requires 6 hours of manufacturing time and each Lady-Sport requires 3 hours of manufacturing time. The Des Moines plant has 2100 hours of engine manufacturing time available for the next production period. Embassy’s motorcycle frame supplier can supply as many EZ-Rider frames as needed. However, the Lady-sport frame is more complex and the supplier can only provide up to 280 Lady-Sport frames for the next production period. Final assembly and testing requires 2 hours for each EZ-rider model and 2.5 hours for each Lady-Sport model. A maximum of 1000 hours of assembly and testing time are available for the next production period. The companies accounting department projects a profit contribution of $2400 for each EZ-Rider produced and $1800 for each Lady-Sport produced.
- Formulate a linear programming model that can be used to determine the number of units of each model that should be produced in order to maximize the total contributions to profit.
- Solve the problem graphically. What is the optimal solution?
- Which constraints are binding?
Deliverable: Word Document 