(All Steps) Consider a network with 6 nodes (marked 1 to 6) and with 7 activities (marked A to G), as given in the following table ACTIVITIES From node To


Question: Consider a network with 6 nodes (marked 1 to 6) and with 7 activities (marked A to G), as given in the following table

ACTIVITIES From node To node Durations Preceded by
activity
A 1 2 10 ---
B 1 3 7 ---
C 2 3 5 A
D 2 4 13 A
E 3 5 4 B, C
F 4 6 12 D
G 5 6 14 E
  1. Draw a diagram of this network
  2. Determine the critical path through the network, and its total duration
  3. Find out which activities have slack times, and what those times are.