[All Steps] The total cost C(x) incurred by the On-Time Watch Company at one of its plants during a given day is given by C(x)=1500+30x+x^2, 0≤ x≤
Question: The total cost \(C\left( x \right)\) incurred by the On-Time Watch Company at one of its plants during a given day is given by \(C\left( x \right)=1500+30x+{{x}^{2}},\,\,0\le x\le 75\), where \(x\) is the number of watches produced
- What is the average cost On-Time incurs in manufacturing fifty watches at this plant in one day?
- Find \(C'\left( x \right)\)
- What is the rate of change in the total cost when the level of production is 15 watches per day?
- What is the approximate cost of producing the 16 th watch?
Price: $2.99
Solution: The downloadable solution consists of 1 pages