(See Steps) The Ledo Tub company manufactures two lines of bathtubs, called model A and Model B. Every tile requires blending a certain amount of steel
Question: The Ledo Tub company manufactures two lines of bathtubs, called model A and Model B. Every tile requires blending a certain amount of steel and zinc; the company has available a total of 25,000 pounds of steel and 6,000 pounds of zinc. Each model A bathtub requires a mixture of 125 pounds of steel and 20 pounds of zinc, and each yields a profit to the firm of $90.Each model B tub produced can be sold at a profit of $70;it in turn requires 100 pounds of steel and 30 pounds of zinc.
- Use solver to find the best production mix of bathtubs.
- Are all resources consumed? Explain.
- If additional steel is available at a price of 75 cents a pound, how much should be produced?
- How much would the profit on model B tubs have to increase before they would be produced?