[All Steps] Irwin Textile produces two types of cotton cloth-denim and corduroy. Corduroy is a heavier grade of cotton cloth and, as such requires 7.5 pounds


Question: Irwin Textile produces two types of cotton cloth-denim and corduroy. Corduroy is a heavier grade of cotton cloth and, as such requires 7.5 pounds of raw cotton per yard, whereas denim requires 5 pounds of raw cotton per yard. A yard of corduroy requires 3.2 hours of processing time, a yard of denim requires 3.0 hours. Although the demand for denim is practically unlimited, the maximum demand for corduroys is 510 yards per month. The manufacture has 6.500 pounds of cotton and 3.000 hours of processing time available each month. The manufacture makes a profit of 2.25 per yard of denim and 3.10 per yard of corduroy .The manufacture wants to know how many yards of each type of cloth to produce to maximize profit.

Solve the model formulated for Irwin Textile Mills graphically.

a- How much extra cotton and processing time are left over at the optimal solution? Is the demand for corduroy met?

b- What is the effect on the optimal solution if the profit per yard of denim is increased from $2.25 to $3.00? What is the effect if the profit per yard of corduroy is increased from 3.10 to $4.00?

c-what would be the effect on the optimal solution if Irwin Mills could obtain only 6.000 pounds of cotton per month??

Price: $2.99
Solution: The downloadable solution consists of 4 pages
Deliverable: Word Document

log in to your account

Don't have a membership account?
REGISTER

reset password

Back to
log in

sign up

Back to
log in